Certification : CE; ISO9001
Place of Origin : Qinyang City,Henan
MOQ : 1 set
Payment Terms : L/C, T/T, Western Union, MoneyGram
Delivery Time : 30 -45 days
Packaging Details : Wooden Case Wrapped Loaded in Container
Price : USD 10000-50000
Roller Material : Carbon/stainless steel,Aluminum alloy or other specified material
Surface Treatment : Trivalent chromium galvanized, Chrome, Paint, Anodized, Teflon Spray
Face Length : 2500-9000mm
Operating Speed : 2200m/min
Feature : High-quality and Efficient
Diameter : 350-900mm
High Performance Rubber Coated Guide Roll For Paper Making Machine Spare Parts
Product Description
Guide Roll is used in paper, textile, printing and dyeing, iron and steel industry, from the drive guide, material selection, high-quality, seamless, roller surface coated rubber, composite, Copper or Chrome.
Detailed Images
Diameter(mm) | Design pressure (MPa) | Material | Hardness(HB) | Face length(mm) |
1500 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
1800 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
2000 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
2500 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
Packaging
1. Fixed all the movable parts with plastic films.
2. Polystyrene foam plate wrapped around.
3. Wrapped with tighted plastic films several circles.
4. Fixed machine on the fumigated plywood pallet with iron wire.
5. Wrapped with wooden board around and nailed on.
Shipping
1. Shipment can be by sea, by train, by truck;
2. Delivery Time: within 40 days after first payment or L/C.
FAQ
Q: What's your Advantage? Why shall we choose your Company?
A: We have the most professional techniques and team, according to the customer requirements, we supports customized machine.
A: We are a professional manufacturer and warmly welcome clients from worldwide to visit our factory and cooperate with us.
Q: How about is the warranty of the Spare Parts?
A: One year warranty except the consuming spare parts.
Q: What is the Service?
A: 7 days 24 hours on line service, engineer oversea service is also available if necessary.
Q: What is the Delivery Time?
A: 45 working days after the confirmation of the order.
Q: What's the payment terms?
A: T/T would be better with quick transfer and few bank fees,30% deposit, balance before shipment.
Guide Roll 1500mm 0.8MPa Paper Machine Parts Images |